The discussions led to the opportunity to collaborate with a nearby operator in acquiring the site survey.īaron said the collaboration was expected to result in significant cost savings due to shared services and vessel mobilisation, compared to standalone acquisition. SundaGas had been actively engaging in dialogues with other companies operating in the area to identify potential operational synergies for the drilling of the Chuditch-2 appraisal well. It said the survey would comprise geophysical studies and physical investigations of the seabed and shallow geological section. The company said the primary aim of the site survey, a mandatory requirement, was to pinpoint potential hazards at the proposed well site, ensuring the safe placement of a drilling rig with minimal environmental impact. Operations for the site survey were scheduled to take place during February and early March. The AIM-traded company said its subsidiary, SundaGas, had finalised contracts to conduct a site survey at the designated drilling location for the Chuditch-2 appraisal well.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |